![]() Original opening from kitchen to family room |
![]() 8-13 Paneling removed and holes patched |
![]() 8-13 Paneling removed and holes patched |
![]() 8-13 Half wall look |
![]() 8-14 Fireplace with new wall color |
![]() 8-14 Fireplace with new wall color |
![]() 8-14 Opening cleaned up |
![]() 8-23 Ceiling plaster being removed |
![]() 8-23 Ceiling plaster being removed |
![]() 8-23 Ceiling plaster being removed |
![]() 8-29 Ceiling clean |
![]() 8-29 Arch framing installed |
![]() 9-8 Arch drywall installed |
![]() 9-8 Arch drywall installed |
![]() 9-12 Ceiling primed and final plaster touch ups |
![]() 9-12 Second coat of plaster on arch |
![]() 9-20 Arch finished and primed |
![]() 9-26 Wall and ceiling painted |
![]() 9-26 Wall and ceiling painted |
![]() 11-3 Old fireplace surround removed |
![]() 11-3 New frame for the fireplace with cement |
![]() 11-4 New surround 1/2 done |
![]() 11-5 Fireplace done |
![]() 11-7 Start floor |
![]() 11-7 Flooring |
![]() 11-9 More flooring done |
![]() 11-14 More flooring done |
![]() 11-19 Floor Done!! |
![]() 11-19 Floor Done!! |
![]() 12-2 Put jacks in the wall and installed crown molding which need final painting |
![]() 12-2 Installed crown molding, still need to paint it |
![]() 12-10 Base molding installed |
![]() 12-11 Finished interior |
![]() 12-11 Adding furniture |
![]() 12-20 FINISHED!!! |
![]() 12-20 FINISHED!!! |
![]() |
![]() |