Original opening from kitchen to family room |
8-13 Paneling removed and holes patched |
8-13 Paneling removed and holes patched |
8-13 Half wall look |
8-14 Fireplace with new wall color |
8-14 Fireplace with new wall color |
8-14 Opening cleaned up |
8-23 Ceiling plaster being removed |
8-23 Ceiling plaster being removed |
8-23 Ceiling plaster being removed |
8-29 Ceiling clean |
8-29 Arch framing installed |
9-8 Arch drywall installed |
9-8 Arch drywall installed |
9-12 Ceiling primed and final plaster touch ups |
9-12 Second coat of plaster on arch |
9-20 Arch finished and primed |
9-26 Wall and ceiling painted |
9-26 Wall and ceiling painted |
11-3 Old fireplace surround removed |
11-3 New frame for the fireplace with cement |
11-4 New surround 1/2 done |
11-5 Fireplace done |
11-7 Start floor |
11-7 Flooring |
11-9 More flooring done |
11-14 More flooring done |
11-19 Floor Done!! |
11-19 Floor Done!! |
12-2 Put jacks in the wall and installed crown molding which need final painting |
12-2 Installed crown molding, still need to paint it |
12-10 Base molding installed |
12-11 Finished interior |
12-11 Adding furniture |
12-20 FINISHED!!! |
12-20 FINISHED!!! |